Templeborough Biomass Power Plant, Rotherham

LV Switchroom HVAC

Our valued client faced challenges with components and panels overheating in their Low Voltage Switch-room, affecting operational efficiency. Templeboruogh Biomass Power Plant turned to the Align Group for a reliable and effective solution.

Process

We designed and implemented a tailored upgrade to their existing cooling system, installing multiple new ceiling-mounted units strategically positioned around the switch-room to optimise temperature regulation. These units operate independently from the existing system, activating only when additional cooling is needed. This ensures a highly energy-efficient solution, minimising power consumption while maintaining a stable environment.

Outcomes

To support these units, our expert mechanical team ran pipework through the building riser to connect seamlessly to new condenser units mounted on the external roof. This meticulous planning and execution ensured safe and efficient installation without disrupting the building’s operations.

Conclusion

Our trusted Electrical Services team collaborated closely with our Mechanical specialists to deliver a fully integrated, comprehensive solution. The result was a high-quality installation that permanently resolved the overheating issues, exceeding the client’s expectations and leaving them highly satisfied with the outcome.

Accreditations