Templeborough Biomass Power Plant, Rotherham

Turbine Hall Lighting Upgrade

Our esteemed client sought to upgrade the existing lighting in the Turbine Hall at Templeborough Biomass Power Plant, aiming to improve lighting levels and reduce energy consumption. The Align Group was tasked with delivering a comprehensive solution that met their operational and safety standards.

Process

We replaced all ground-floor fluorescent light fittings with JCC ToughLED Pro light fittings, chosen for their durability, energy efficiency, and long lifespan. For the first-floor lighting, our team worked in collaboration with Altrad, who supplied and installed a scaffold on an overhead gantry crane. This complex setup required meticulous planning and coordination to ensure the highest levels of safety and efficiency. Align Management Services played a critical role in overseeing and managing these aspects, ensuring that all work was carried out seamlessly and in line with health and safety regulations.

The project resulted in a significant improvement in lighting levels across the Turbine Hall, enhancing the working environment for the client’s staff. Additionally, the new lighting system dramatically reduced energy consumption, aligning with the plant’s sustainability goals.

Outcomes

Thanks to the close collaboration between our Electrical Services team, Altrad, and Align Management Services, we successfully delivered the project on time and to the client’s satisfaction, with minimal disruption to plant operations. The client was highly impressed with the quality and efficiency of the installation and the professionalism demonstrated throughout the project.

Accreditations